Power Design Primary Metering: Padmount, Pole-Mount and Switch Disconnect

September 3, 2026
Power Design Primary Metering: Padmount, Pole-Mount and Switch Disconnect
Need a quote?$QuoteRequest a Quote

Primary metering puts instrument transformers and a meter on the primary side of a customer's service, so the utility can bill a larger load at medium voltage. Power Design builds this equipment in four styles, all in 15, 25 or 35 kV classes with 200 A or 600 A ratings.

This guide compares the four styles, explains what each includes and lists what to send when you ask for a quote.

The four primary metering styles

StyleBest forKey points
Padmount primary meteringGround-level metering at a customer serviceFiberglass enclosure on a free-standing galvanized steel frame, with the meter base and test switch on the enclosure side or on an optional internal swing-out panel
Padmount metering with swing-out panelAdded security and access to the meter equipmentSwing-out panel option, listed in Power Design's padmount primary metering fused switchgear literature
Pole-mount metering clustersOverhead service where a pad is not practicalAll-aluminum mount, pre-wired and factory tested, with your choice of VTs and CTs
Padmount with switch disconnectWhen the metering point also needs isolation and a visible breakGroup-operated loadbreak disconnect switch inside the same padmount package

Padmount primary metering

According to Power Design, the padmount unit includes:

  • Outdoor-rated, weatherproof fiberglass housing with stainless steel hardware
  • Fiberglass laminate guaranteed for 25 years against degradation of strength under normal service conditions
  • Free-standing, hot-dipped galvanized steel frame, with an optional stainless steel frame
  • A stainless steel sliding bracket on the CT base so equipment can be installed or removed with the enclosure in place
  • Compatibility with instrument transformers from all major manufacturers, connected to the bushings with copper bus bar
  • Black line diagram printed on reflective yellow vinyl tape
  • Secondary wiring color coded to customer specifications, in non-metallic, liquid-tight conduit with corrosion-resistant fittings, including wiring between CTs and PTs
  • Customer-specified meter base and test switch

Power Design says its single and three phase padmount and pole-top primary metering is available in 15, 25 or 35 kV, 200 A or 600 A.

What does the sample specification cover?

Power Design's primary metering switchgear flyer includes a sample specification you can adapt. Highlights:

  • Padmounted outdoor unit for a fiberglass box pad or concrete pad, with conformance to applicable NEC, ANSI, IEEE and NEMA standards plus IEEE C57.12.28
  • Free-standing galvanized frame, factory assembled, with lifting and grounding provisions and a 3/8 in. solid copper ground bar on each side
  • 15/25/35 kV separable insulated connector system per IEEE 386, with outdoor style instrument transformers separated by a galvanized steel bushing plate
  • A second galvanized steel swing-out plate on the back that isolates the transformers and holds the test switch and other equipment
  • Bolt-in cable-to-air bushings rated 200 A or 600 A, 15/25/35 kV, 95/125/150 kV BIL, replaceable in the field
  • Phase and ground barriers, plus a clear Lexan barrier behind the swing-out panel so fuses and transformers can be inspected without removing the safety barrier
  • Instrument transformers mounted and wired to a 10 pole test switch, with flex-poly conduit for the secondary wiring
  • 3/16 in. nominal fiberglass laminate, self extinguishing with a UL 94 flame rating of HB, with a white reflective interior
  • Stainless steel lifting eyes, louvers with screen baffles, and an identification plate
  • Captive penta bolt plus padlock provisions, and an enclosure that removes without disturbing the equipment or cables

This is a sample specification, so your final design may differ. Confirm all ratings and options with Power Design before ordering.

Pole-mount metering clusters

Pole-mount clusters are delivered as a fully assembled, pre-wired and factory tested unit, which Power Design says reduces installation time and field labor. They use all-aluminum, custom-engineered mounts and can be configured with your choice of voltage transformers and current transformers.

DrawingPhaseVoltageBILTopPT bushing
PMC-4531335 kV200 kVCTSingle
PMC-4628325 kV125 kVCTDouble
PMC-4598325 kV150 kVCTSingle
PMC-4532315 kV110 kVCTDouble
PMC-4300315 kV110 kVPTSingle

These are example drawings. Power Design builds to your transformer type, ratio and configuration.

Padmount primary metering with switch disconnect

This style adds a group-operated loadbreak disconnect switch for isolation and a visible break. Power Design lists these features:

  • Fiberglass outdoor weatherproof enclosure with stainless steel hardware, with the laminate guaranteed for 25 years
  • Free-standing, hot-dipped galvanized steel frame that allows full enclosure removal for equipment access
  • Instrument transformers from all manufacturers, connected with copper bus bar
  • Meter base and test switch installed per specification, mounted on the enclosure or a remote junction box
DrawingPhaseVoltageCurrentBILSwitch
PS4-86-2540325 kV600 A125 kVS&C Mini-Rupter
PS4-86-2893315 kV600 A95 kVS&C Mini-Rupter
PS4-86-4408325 kV600 A125 kVS&C Mini-Rupter

What should you specify before ordering?

  1. Phase: single or three phase.
  2. Voltage class and BIL: 15, 25 or 35 kV, and the BIL your design needs.
  3. Current rating: 200 A or 600 A.
  4. Mounting: padmount, padmount with swing-out panel, or pole mount.
  5. Instrument transformers: CT and PT type and ratios, and who supplies them.
  6. Meter and test switch: the meter base and test switch your utility requires, and where it mounts.
  7. Disconnect: whether you need a group-operated loadbreak switch and which one.
  8. Wiring: color coding and any special requirements.

Power Design asks customers to describe their needs in a design form, and a sales representative follows up. Contact us and we can pass on the requirements.

Power Design primary metering brochures

Frequently asked questions about Power Design primary metering

What voltage and current ratings are available?

15, 25 or 35 kV, with 200 A or 600 A ratings, in single and three phase versions.

Can I use my own instrument transformers?

Power Design says the equipment supports instrument transformers from all manufacturers, and the pole-mount clusters take your choice of VTs and CTs.

Is the equipment pre-wired?

Pole-mount clusters are pre-wired and factory tested. Padmount units include secondary wiring, color coded to your specification.

How is the meter mounted?

On the enclosure side, on an optional internal swing-out panel, or on a remote junction box, depending on the style.

Can it include a disconnect switch?

Yes. The switch disconnect style has a group-operated loadbreak switch that provides isolation and a visible break.

How long is the fiberglass guaranteed?

Power Design guarantees the fiberglass laminate for 25 years against degradation of strength under normal service conditions.

Where can you get Power Design primary metering?

For questions or a quote, contact Powertech Associates and UPSC at info@powertech-upsc.com or (860) 678-8772. Send us your voltage, current, phase, transformer details and meter requirements.

See also: Power Design cable junction pedestals and Power Design padmount enclosures.

Sources

Last updated: November 2026.

Interested in this product?

Contact us, request a quote, or order online.